english deutsch
Logo MESSER
SCC** DIN ISO 9001:2015
Logo Messer

icon print
PRINT
WSM MESSER
Spezialmontagen GmbH


Power-Plant building
Assembly of plant sections

... in power plants

Montage Aschekuehler

Assembly of an ash cooler in the power plant in Walsum 2009

 

Assembly of a MAGALDI – Ash-removal plant

Client:                             HITACHI Power Europe GmbH
Construction site:         Kraftwerk Walsum
Period of Assembly:     24.08.2009 - 26.02.2010

Montage Kohlestaubsilos

Assembly of carbon dust silos in the power plant "Schwarze Pumpe" 2006

 

Assembly of two carbon dust silos

Client:                                  AJO - tec GmbH
Construction site:             Power plant "Schwarze Pumpe"
Period of assembly:         April until August 2006



© 2024 by MESSER GRUPPE