Power-Plant building
Montage Aschekuehler
Assembly of an ash cooler in the power plant in Walsum 2009
Assembly of a MAGALDI – Ash-removal plant
Client: HITACHI Power Europe GmbH
Construction site: Kraftwerk Walsum
Period of Assembly: 24.08.2009 - 26.02.2010
The works included the assembly of the MAGALDI ash-removal plant beneath the boiler plus the removal and intercalation of the ash next to the boiler house.
(Updated: 06.01.2017 | 13:25